12. Upper Brickwork

The wall construction continues towards roof level.

Scaffolding was now needed with walkways at high level so that the walls could be built to the top of the metal frame. 

 

Stacks of bricks and blocks were delivered and a small crane moved the supplies high onto the walkways.

Hod carriers made the last delivery to the far side of the frame.

As the front gable end work  begins,  construction of the outer circle of bricks for the mosaic feature can be seen.