12. Upper Brickwork |
|||
|
The wall construction continues towards roof level. |
|||
|
|
Scaffolding was now needed with walkways at high level so that the walls could be built to the top of the metal frame. |
|
Stacks of bricks and blocks were delivered and a
small crane moved the supplies high onto the walkways.
|
|
|
Hod carriers made the last delivery to the far side of the frame. |
|
As the front gable end work begins, construction of the outer circle of bricks for the mosaic feature can be seen. |