2 Demolition |
||||||||||||
|
The demolition team stripped out the hall fixtures before heavy equipment arrived and quickly demolished the hall. |
||||||||||||
|
|
Work started inside the hall. Doors, cupboards and kitchen fittings were detached. |
|
An extremely large digger was manoevered onto the site with some difficulty. |
|||||||||
|
The operator made a noisy start by smashing the windows and continued to flatten the hall at great speed. |
|
The various materials were sorted into piles for collection. The operation attracted a constant stream of interested spectators. |
|
|||||||||