|
23. Outside Features |
|||
|
Around the outside of the new hall walkways, steps and ramps are constructed. |
|||
|
|
A level walkway has been constructed along the side of the hall giving access to
the hall doors and the kitchen door. Paving slabs are being laid.
|
|
At the rear of the building a ramp is being built for disabled access. This leads to the main rear door and the lift. |
| A welder builds the galvernised metal balustrade for the stairs leading to the kitchen door. |
|
Steps are build for the new pedestrian access from Charterhouse Road. | |