|
26. Kitchen & Servery Equipment |
|||
|
Appliances for the kitchen and lounge servery area are delivered and installed. |
|||
|
|
Kitchen equipment is stacked in the hall, waiting to be moved into place.
|
|
A large central ventilation and air extraction system is built in the kitchen and roof above and vinyl floor is laid. |
|
|
Stainless steel tabling, hot cupboards, fridge, sinks cookers and dishwasher in situ waiting to be unpacked. |
|
The lounge carpet tiles are laid and servery units fitted. A small frig fits under the worktop next to the sink unit. |