28. Outside Finishing |
|||
|
Gradually the builders cabins are removed and the grounds are resurfaced. |
|||
|
|
Paving is continued from the side walkway around to the front of the building.
|
|
The foundation stone which was given a temporary home after laying in July is now in its permanent place in the front brickwork. |
![]() |
Tarmac is laid and the mud has disappeared at last. New double gates are fitted to the vehicle entrance. |
|
Parking areas are marked out. Topsoil is laid on the new flower beds and
areas to be grassed.
|