28.  Outside Finishing

Gradually the builders cabins are removed and the grounds are resurfaced.

 

Paving is continued from the side walkway around to the front of the building.

 

 

  The foundation stone which was given a temporary home after laying in July is now in its permanent place in  the front brickwork. 

Tarmac is laid and the mud has disappeared at last.  New double gates are fitted to the vehicle entrance.

  Parking areas are marked out. Topsoil is laid on the new flower beds and areas to be grassed.

 