4 Site Levelling |
||||||||||||
|
The contractors brought in a variety of equipment to dig out, move and level the ground following detailed plans and surveyors measurements. |
||||||||||||
|
|
Sand was delivered and the process of building a base for the entrance road and parking areas began |
|
Dumper trucks loaded with earth and rubble ran around the site redistributing the spoil. |
|||||||||
|
Architect, site manager and surveyor overseeing the operations. |
|
A firm level base was built up to match the existing church building. |
|
|||||||||