7 Rear Lower Floor |
||||||||||||
|
When excavation for the lower ground floor was completed, blockwork walls, slab floor and facing bricks could be put in place. |
||||||||||||
|
|
A huge silo full of mortar was delivered and installed. The bricklaying team could now start work. |
|
The hole at the rear of the site takes shape as the lower floor rooms and blockwork shows the outline of the rooms. |
|||||||||
|
The floor slab and damp proofing have been installed. Some outer bricks are laid and position of windows, doorways and outside steps can be seen. |
|
Now it is possible to step inside and see the layout, and visualise how it will connect to our church undercroft rooms. |
|
|||||||||