|
9 Floor Laying |
||||||||||||
|
Installing the roof slab for the lower floor and the flooring for the main complex level was a delicate operation. |
||||||||||||
|
|
Pre-formed concrete floor slabs were brought by lorry. |
|
A very large crane arrived and each slab was lifted off the lorry and swung high in the air over the steel hall frame. |
|||||||||
|
The slabs were carefully lowered and guided into place by the crew. |
|
The floor is completed and awaits the external brickwork. |
|
|||||||||