21. Inside the Vestibule |
|||
|
Big changes are also taking place inside the church vestibule. |
|||
|
|
The wall between the vestibule and creche is removed. Supports for new balustrade and step handrail are fitted. |
|
The rear section of the vestibule floor and the entire creche floor are both raised to the level of the church and hall.
|
|
|
The new floor and handrails are installed and creche wall built. Radiators and new lights are fitted. The walls are cleaned and painted. |
|
Walls and ceilings are painted. A red carpet is fitted across the entire vestibule floor, to match the church carpet. |